The complete UK new build snagging checklist
A room-by-room inspection guide for new build homeowners - backed by a free app that turns your checklist into a structured, photo-evidenced record your developer can act on.
Room-by-room: what to check on a new build
A high-level snapshot of the most common defect categories. Use Defectly to record each item as you walk through your property.
External & Roof
Roof tile alignment, guttering, downpipes, external wall finishes, rendering, brickwork pointing, driveway level, fence and gate condition.
Doors & Windows
Doors closing flush, hinges and handles secure, window seals airtight, frames level, locks operating smoothly, draught-free fit.
Walls & Ceilings
Plaster smoothness, paint coverage, no cracks at junctions, skirting board fit, architrave alignment, no nail or screw pops.
Bathrooms
Sealant continuity around bath/shower, tap operation, drainage flow, tile alignment, extractor fan operation, no visible leaks.
Kitchens
Cupboard doors level and self-closing, worktop sealant, integrated appliances functioning, sink drainage, no chips or scratches.
Electrics & Heating
Every socket and switch tested, smoke and CO alarms operational, heating and hot water working in every room, thermostat responsive.
Snagging in three steps
A repeatable process you can run during your pre-completion inspection and throughout your warranty period.
Step 1
Walk through with the checklist
Inspect each room methodically using a printed or digital checklist. Take your time - pre-completion inspections often last 2-3 hours for a typical 3-bed house.
Step 2
Photograph every defect
Take a wide shot showing the location, then a close-up showing the defect. Defectly stamps each photo with the defect reference so nothing gets lost.
Step 3
Send to your developer
Share live access with your developer, or export a PDF evidence pack (included from your second property). Track each item from "open" to "resolved" with a timestamped audit trail you can rely on.
Paper checklist vs Defectly
Scattered across chats, calls, and memory
Reports arrive everywhere. Photos live in someone's phone. Nobody knows whose turn it is.
- Photos stored separately from the checklist line item
- No central status - what is fixed, what is outstanding?
- Easy to lose, hard to share with your developer
- No timestamped audit trail for warranty disputes
- Manual chasing for each repair update
- No visibility once the developer takes the list away
One timeline, from report to resolution
Every action stamped, every person notified, every photo attached, automatically.
- Photos and notes attached to every defect by reference number
- Live status - open, in progress, resolved, verified
- Share access with your developer in one click
- Immutable timestamped record for warranty and ombudsman claims
- Automatic notifications when status changes
- Visibility through your full defect liability period
Snagging questions, answered
When should I do my new build snagging inspection?
Should I hire a professional snagging surveyor?
What is the difference between snagging and a defect?
How long does my developer have to fix snags?
Can I claim against my warranty if snags are not fixed?
Is the Defectly snagging app free?
Still have questions?
Browse the full FAQBe ready to snag from day one
Free for one property. No credit card required. Your developer will get a more professional report than they are used to.